What are the main challenges faced by community solar projects

What are the main challenges faced by community solar projects

Community solar projects face a range of significant challenges that affect their development, operation, and long-term success. These challenges can be broadly categorized as follows:

Main Challenges Faced by Community Solar Projects

1. Grid Infrastructure and Interconnection Delays
A major obstacle is the aging electric grid infrastructure, which is often outdated, with limited capacity and at risk of outages and failures. This strain makes it difficult to accommodate new renewable energy generation sources like community solar. The interconnection process—connecting the solar project to the grid—can be lengthy and delayed, causing uncertainty and increased costs that threaten project viability.

2. Regulatory and Policy Barriers
Regulatory frameworks vary widely across regions, with some areas lacking enabling legislation for community solar or imposing complicated interconnection rules. Eligibility requirements for subscribers, geographic restrictions, caps on participation levels, and different utility allowance structures can limit market size and complicate project development and customer acquisition.

3. Financing and Economic Challenges
Financing community solar projects can be difficult due to limited operating reserves of providers, small project sizes, and challenges in finding investor partners. Economic benefits depend heavily on utility incentives, tax credits like the federal Business Energy Investment Tax Credit (ITC), and local regulations. Split incentives, where costs and benefits are not aligned between providers and tenants (e.g., in master-metered vs. individually metered buildings), further complicate financial models.

4. Customer Acquisition and Engagement
Attracting and retaining customers is challenging due to restrictive eligibility rules, lengthy sales cycles, and customer uncertainty about the timing and size of their savings. Communication and education about the costs, benefits, and responsibilities of participation must be clear to maintain long-term satisfaction and engagement.

5. Operational and Administrative Complexities
After construction, operational challenges include navigating standards for grid reliability, which may delay project commissioning by up to 24 months after customer enrollment. Compiling accurate customer bills is complicated by the lack of standardized data exchange between utilities, metering, billing, transmission and distribution charges, and solar subscription managers. Additionally, there are challenges related to long-term operations and maintenance (O&M), including technician shortages.


Addressing these challenges requires improvements in electric infrastructure, supportive and streamlined regulations, innovative financing mechanisms, and efficient customer and project management systems. With these improvements, community solar can play a pivotal role in expanding access to renewable energy and achieving sustainability goals.