1. Permitting and Regulatory Approvals

  • Securing all required permits and grid interconnection approvals is essential but often a major cause of project delays or cancellations. Multiple Authorities Having Jurisdiction (AHJs), including local planning boards and federal agencies, typically review projects, which can extend timelines due to varying zoning, testing, and safety requirements.
  • Permitting also involves addressing safety concerns such as the risk of thermal runaway, which can lead to explosions or fires, making safety standards and proper design critical in permitting processes.

2. Profitability and Market Dynamics

  • Battery siting is critical to profitability, requiring analysis of grid locations where energy storage adds maximum value. Developers must consider existing grid infrastructure and proposed projects to avoid cannibalizing returns.
  • Dispatch optimization is another challenge. Batteries must be operated efficiently based on market price volatility, ancillary service demands, and battery cycling constraints to maintain economic viability.
  • Rapid changes in regulatory frameworks and market conditions add uncertainty, requiring flexible strategies for operation and financial planning.

3. Operational Limitations and Battery Degradation

  • Batteries have operational constraints that traditional generation resources do not face. For example, their state of charge must be carefully managed to avoid accelerated degradation. Limits on the number and depth of charge/discharge cycles and the provision of ancillary services affect battery lifespan and usage.
  • If battery use cases are misunderstood or change unexpectedly, degradation can accelerate, shortening operational life and increasing costs.
  • Some new battery chemistries have uncertain degradation profiles, adding risk to procurement contracts and long-term performance expectations.

4. Procurement and Supply Chain Risks

  • Delays in battery procurement can impact compliance with regulatory mandates and delay project completion. Supply chain and manufacturing lead times remain significant challenges, especially with the rapid growth in utility-scale storage deployments.

These challenges show that utility-scale battery projects require careful planning around regulatory approval, site and market analysis, procurement timing, and technical management of battery operations to be successful and sustainable. Addressing safety concerns and operational limits is especially important to ensure longevity and reliability of storage assets.