
Exciting Development! On May 22, 2025, Giant New Energy announced the successful connection to the grid of the 6MW distributed generation project located in Huangshan Bay. This project is anticipated to generate approximately 600,000 kWh annually, significantly reducing carbon emissions by 5,500 tons per year, contributing to the region’s commitment to carbon neutrality.
The project utilizes advanced solar technology and is designed to operate efficiently in a compact footprint. It employs high-strength materials and a lightweight design to reduce the overall load while enhancing performance during extreme weather events, such as typhoons and heavy rainfall. The integration of a robust support system allows for a streamlined installation process, minimizing the need for complex maintenance.
Furthermore, this project underscores the design philosophy of “natural ventilation,” which effectively lowers the internal temperature of the installation, improving overall energy efficiency. The support structure is optimized for maximum usage of steel resources while ensuring compliance with safety standards.
The project aims to promote the use of green energy in the region and is part of a broader initiative to integrate renewable energy sources into the local power grid. The successful grid connection represents a crucial step towards a sustainable future, demonstrating Giant New Energy’s commitment to innovation and environmental responsibility.
Looking ahead, Giant New Energy plans to expand its renewable energy footprint significantly, collaborating with more partners to enhance the efficiency and accessibility of clean energy solutions.
For more information on the project, please visit Solarbe News.
Original article by NenPower, If reposted, please credit the source: https://nenpower.com/blog/success-of-6mw-offshore-wind-power-project-in-hainan-marks-a-new-era-in-renewable-energy-deployment/
