Rui Pu Lan Jun Successfully Delivers 300MWh Energy Storage Project and Prepares for CIBF 2025 Exhibition

Rui

Ruipu Lanjun’s 300MWh Energy Storage Project Successfully Delivered | Ruipu Lanjun to Appear at CIBF2025 [Hall 12, Booth 12T028]

Release Date: May 7, 2025

Keywords: Lithium Battery

Recently, a grand ceremony was held to celebrate the mass delivery of the 300MWh energy storage containers at the project base of Ruipu Lanjun. This delivery marks the official transition of the project into a substantial operational phase, injecting significant momentum into the development of the new energy industry and highlighting Ruipu Lanjun’s leading capabilities in the energy storage technology sector.

1. Industry-Leading Technology, Setting the Benchmark

The energy storage system in this project utilizes Ruipu Lanjun’s self-developed high energy density lithium iron phosphate battery technology. It is equipped with an intelligent temperature control system, multiple safety protection mechanisms, and an AI-driven energy management platform, ensuring that the system operates efficiently and stably even under extreme conditions, significantly enhancing the capacity for renewable energy consumption.

2. High-Standard Manufacturing Domestically and Internationally, Exceptional Quality

Ruipu Lanjun strictly adheres to the highest standards, including international IEC and UL standards as well as domestic GB/T standards, during design, production, and testing. The products have obtained multiple international certifications and utilize fully automated production lines and industrial-grade quality control systems, achieving zero-defect delivery from cell production to system integration.

3. Comprehensive Lifecycle Service, Customer First

Ruipu Lanjun consistently upholds the principle of “Quality First, Service Foremost,” providing customers with comprehensive lifecycle services from project planning and equipment supply to operation and maintenance management. The company has established a remote monitoring platform and a rapid response mechanism to ensure the long-term stable operation of energy storage systems.

Once fully completed, this project will significantly enhance the local grid’s peak shaving capabilities, promoting the efficient utilization of renewable energy. Ruipu Lanjun will continue to focus on green, innovative, and efficient solutions to drive the high-quality development of the new energy industry, contributing Chinese wisdom and solutions to the global energy transition.

The 17th Shenzhen International Battery Technology Exchange Conference/Exhibition (CIBF2025), hosted by the China Chemical and Physical Power Industry Association, will be grandly held at the Shenzhen International Convention and Exhibition Center from May 15-17, 2025. Ruipu Lanjun will showcase its latest technologies and products at Hall 12, Booth 12T028.

Additionally, from May 15-16, a conference on Electric Aviation and Next-Generation Battery Technology (CIBF2025 Shenzhen), co-hosted by the Power Battery Application Branch and Battery China Network under the guidance of the China Chemical and Physical Power Industry Association, will take place in Shenzhen. On the opening day, during the session titled “Low Altitude Economy, A New Engine for Industry Development”, Liu Wei, the R&D Director of Ruipu Lanjun Energy Co., Ltd., will deliver a speech titled “WenDing® Battery Supports the Development of the Low Altitude Economy”. Stay tuned!

Original article by NenPower, If reposted, please credit the source: https://nenpower.com/blog/rui-pu-lan-jun-successfully-delivers-300mwh-energy-storage-project-and-prepares-for-cibf-2025-exhibition/

Like (0)
NenPowerNenPower
Previous May 7, 2025 7:04 pm
Next May 7, 2025 7:57 pm

相关推荐